Our client QClad was the roofing contractor on a large Defence project in Newcastle, NSW. The site comprised several architectural structures for which generic guardrail systems were unsuitable.

QClad contacted EWRG, requesting options. With strict deadlines in place, we needed to work quickly on the solutions and come up with designs that would suit the various requirements.

To meet the urgent timeframe, we decided to adapt several brackets to create new and fully engineered systems.

Our engineers rallied to the cause, the adaptions worked, and we were able to develop and produce training instruction manuals for the installing team that would ensure both the new gear and installations met all the legal requirements.

The new brackets were an innovation that enabled the job to go ahead, without delay.